CV-Student Supervision (Undergraduate
Theses-Supervised) Updated: 2023-01-30 |
|
Institution
|
Academic Year
|
# of Projects*
|
Project Title
|
Project Team
|
İstanbul Kültür
University
|
2003-2005
|
1-17
|
Projects
done in the field of industrial engineering
|
Group of
senior students
|
Kadir Has
University
|
2006-2014
|
18-45
|
Projects
done in the field of industrial engineering
|
Group of
senior students
|
Institution
|
Academic Year
|
# of Projects
|
Project Title
|
Project Team
|
Kadir Has University
|
2014-2015
|
46 |
ANP-Based Approach to Evaluate Public Transportation
Vehicles with Alternative Fuel Types |
Aslı Beşir, Ece Yücel, Feyza Güner |
47 |
Effectiveness Implementation of Total Productive
Maintenance System in a Turkish Firm |
Ahmet Can Güler, Aras Dilber, Korcan
Söylemez |
||
2015-2016
|
48
|
Determining the locations of distribution
centers through set covering and gravity methods: A case study in Borusan Automotive A.Ş.
|
Tuğçe Aydemir,Anilda İngilli, Şeyma Mutluç, Sinem Ünalan
|
|
49
|
Distribution system optimization through
simulation with a case study
|
Didem İrem Atik, İlayda Demirkan, Başak Günindi,
Melis Kaşka
|
||
50
|
Comparison of lot size methods in a MRP
system with a case study
|
Ayberk Çelik, Semihcan
Dodurgalı, Gizem Şahin, Reyhan Şahin, Batu Şenkür
|
||
2016-2017
|
51
|
A road map design for a new manufacturing
plant establishment: A case study in textile industry
|
Betül Batmaz, Nisa Sahra Türen, Kutay Büyükbayram, Ömer
Doğukan Güleryüz
|
|
52
|
Determining the best logistics routing
method to minimize the total transportation cost with a case study in Ekol Offset A.Ş.
|
İbrahim Can Yalvaç, Salih Can Tezel, Tolga Nazlı,
Kerim Toygun Çavaş
|
||
53
|
Determining the best clean renewable energy
source based on AHP and TOPSIS: A numerical example in Turkey
|
Bekir Yavuz, F. Çisem
Odabaşı,
H. Pelinsu Adanalı, Havvanur Yılmaz
|
||
2017-2018
|
54
|
Location selection for a cement factory
using Fuzzy AHP
|
İrem Göncü, Görkem Yavaşal,
Orhun Kasap
|
|
55
|
Locating bike sharing systems using Fuzzy
AHP
|
Egesu Köktürk, Fatma Büsra Fırat, Halil Enes
Gezer, Kübra Saykal, Melek Belgin Acar
|
||
2018-2019
|
56
|
Facility layout optimization using Arena
simulation software with a case study: Mita Kalıp
ve Döküm Sanayi ve Ticaret
A.S.
|
Muhammed Cihad Büyüközer, Cansu Keskinçivi,
Atakan Mutlu, Yagmur Özkan, Mehmet Furkan Öztürk
|
|
2019-2020
|
57 |
Evaluation of the factors affecting innovation capacities of firms in automotive
industry (The 2nd Best Design Project out of 20 projects) |
Bahar Yağtu, Utku
Erim Ertan, Mustafa Kurtul |
|
58 |
Optimum selection and cost analysis of cars according to fuel type
using TOPSIS method |
Baran Bakioğlu, Cemre Ersoy, Mehmetcan Berk Salıcı,
Tuğçe Ersoy |
||
2020-2021
|
59
|
Hesitant
fuzzy TOPSIS approach to determine the best hospital location for Covid-19: A
case of Istanbul Anatolian Region |
Özlem Filiz, Sena Nur Aslan
|
|
60
|
A
SWOT-based AHP-TOPSIS approach to evaluate market segmentation strategies in
on-line ordering of food-serving platforms (The 3rd Best Design Project out of 20 projects) |
Melisa Kocabay,
Sinem Cezayirli, Dilara Yıldız, Zeynep
Berfin Benli
|
||
61
|
A
Comparison study of AHP and AHP-TOPSIS approaches for Enterprise Resource
Planning software with an example in Harley-Davidson Motor Co. |
Aylin Açıkalın,
Merve Yıldırımlı, Serdar Ayata, Furkan Üzümcü, Semih Başgöl
|
||
2021-2022
|
62
|
Establishing
of a production scheduling system through Python in pipe manufacturing: A
case study in Ortaklar Co. |
Anıl Ceylan, Ezgisu
Koca, Korhan Şenyurt, Serra Özenç
|
|
63
|
Medical
device maintenance management & improvement efficiency for operating
rooms: A case study in Estetik International Co. |
Berkant Olçay,
Ekrem Ayyıldızoğlu, İrem Çohantimur, Hazal Berivan Baycar
|
||
Piri Reis University
|
2023-2024
|
64
|
Performance
analysis of a manufacturing system through simulation: A case study of Kayatel A.Ş. |
İrem Sevim
|
65
|
Supplier
selection in a paper packaging company through fuzzy AHP-TOPSIS with a case
study |
İrem Nur Çığ
|
||
66
|
A fuzzy
AHP approach to evaluate pilot candidates in an aviation sector |
Sezin Şendur
|
* The projects done before 2014-2015 academic year are not listed.
Each project is done by a group of students
|